All contractors are required to register with the facility before work can be performed on site. Registration materials include a valid business license, certificate of insurance listing the Spokane Public Facilities District and the City of Spokane as additional insured and other supporting documents if necessary. Upon registration, the facility will provide all rules and regulations needed to work within the facility. Failure to register will result in an interruption of work in progress until such time as the proper paperwork is filed with the facility. Call 509-279-7000 and ask for the Facility Services Department for a registration packet.
DECORATOR DAY
- A Decorator Day is defined as a day for the decorator to set up booth spaces, lay carpet, etc. It
is not a move-in day, so no exhibitors can move in on a decorator day without prior written
approval of the General Manager.
- Building security will be required during decorator days unless the service contractor has been
identified as a Recommended Provider by the management of the Spokane Convention
Center.
- Decorator Days are charged at a discounted rate.
GENERAL INFORMATION
- The Spokane Convention Center Event Supervisor is the Contractor's main contact for
all aspects of the event. Contractor is expected to comply with the Event Supervisors requests
and direction, particularly as to safety and security matters.
- Contractors are required to sign in at the Security office when entering the facility and must sign
out upon leaving. A Service Contract supervisor or foreman must be present before their
employees may enter the building. Service contract employees must be identifiable by uniform,
nametag or badge.
- The appropriate route to and from your work area is through the loading dock corridor. You are
not authorized to utilize front of house thoroughfares. The lobby areas, doors, escalators and
passenger elevator are for pedestrian traffic, not move-in and move-out. All move-in and
move-out of exhibits must be through designated loading docks, freight doors and freight
elevators.
- A detailed and accurate production schedule is required thirty (30) days prior to the first move
in day.
- Outside food and beverages are not permitted in the facility at any time.
- Adequate light levels will be provided during decorator set-up and decorator move-out days.
No air conditioning or heat will be provided beyond the norm for a dark day.
- By State Law, the Spokane Convention Center is designated a non-smoking facility. Smoking
is not permitted inside the building or within 25 ft of any entrance or outside air vent. Smoking
is permitted in designated areas only.
- Parking for contractor employees is not provided.
- Landscaping/Soil Displays: Displays containing soil, humus, or similar materials must use a
minimum of 1/2" plywood or similar type of approved sheathing and a protective coating of
plastic or Visqueen to protect the floor and all Spokane Convention Center equipment. Curbing
must be used to retain loose materials and to prevent leaks and water seepage.
- Storage of service contract provider equipment such as forklifts, truck trailers etc., is not
permitted before or after the lease premises date(s) specified on the contract. Crate storage
locations will be assigned by the Event Supervisor as available. Storage areas may not block
access to any door, fire hose/extinguisher cabinet or pull-station. Contractor will respond to
Centers reasonable requests for consolidation / cleanup of storage areas during the event.
Pallets or other contractor or exhibitor packing material left on property will be subject to a
disposal fee.
- Contractors must use the utmost care to protect all surfaces in the facility from damage.
Protection may include padding, the use of non-marring products, Visqueen, plywood, rubber
bumpers and tires, and proper supervision. No pin, tacks or adhesives of any sort are permitted
on any wall or door. Only approved tape may be used to secure carpets to flooring. For more
details on protection of the facility, refer to the Planner's Packet on our website:
www.spokanecenter.com
- Damage. The General Contractor is encouraged to inspect the premises with the Event Supervisor
to note any pre-existing damage. Licensee will be held liable for any damage caused by
the Contractor, unless the Contractor requests and Center approves appropriate billing.
- Cleaning. The authorized areas are turned over to the licensee under a 'clean hall' to 'clean
hall' policy. Licensee (or general service contractor) will be responsible for removing trash from
and cleaning areas including, but not limited to, utilized for registration, loading dock(s), exhibit
floor space and removal of tape and it's residue from floors. Excessive clean up required by the
Spokane Convention Center staff will be charged to the licensee.
SAFETY FIRST
- Safety First: All work at the facilities must be in accordance with national, state and local safety
codes. These include, but are not limited to OSHA, WSHA and facility policy.
- Signs and traffic marking in the loading area must be obeyed at all times. Overnight parking is
not permitted unless special arrangement have been made in advance and approved by the
management of the Spokane Convention Center.
- All personnel operating equipment must have a valid operators license (license must be
available for review). Contractor will comply with Spokane Convention Center safety regulations,
including proper use of harnesses and other safety equipment and operator certification.
- Spokane Fire Department Rules and Regulations must be adhered to. Copies are available on
our website or by request through the Event Supervisor.
- Floor load capacities must be observed; any variation must have prior written approval from
the facility.
Registration Areas
- A 'to scale' diagram of the registration area(s), if separate from the exhibit hall floor, is required
no less than 30 days prior to the event. The Spokane Convention Center Event Supervisor
must approve placement of the registration area.
- Registration areas, entrance units and other show specific displays may be installed during
times that do not conflict with the activity of events already in progress.
EXHIBIT FLOOR PLAN REQUIREMENTS
- All floor plans must be submitted to the Fire Marshall for approval. It is best to submit a plan
for review before booths are sold in an effort to avoid costly changes involving exhibits. See
Spokane Fire Dept. Regulations for complete details.
- Submit the approved 'to scale' exhibit floor plan including booth assignments to the Event
Supervisor no less than 30 days prior to move-in.
- Show carpet will be properly stretched to eliminate uneven walking surfaces; and secured at
edges and seams with double-sided gaffers or other professional tape as approved by the
Event Supervisor. Transitions between carpet and bare floor will also be taped down to minimize
tripping hazards. Carpet overlap in show areas may not exceed two layers. Cord runs should
be located wherever possible in non-traffic areas; and when run across traffic areas on or
under carpet, marked with caution tape.
Move In
- Dock spaces are assigned by the Event Supervisor.
- All freight must be handled through the general service contractor who will deliver it to the
facility during the approved move-in period. The Spokane Convention Center does not accept or
ship freight for the client or exhibitors. Any freight scheduled for delivery to the facility during the
move-in periods must be sent to the attention of the service contractor/decorator.
- Requests for drop of equipment or marking of the floor prior to dec-in day must be approved by
the Event Supervisor.
- Automobiles are not allowed in the facility without approval by the Event Supervisor.
- Motorized vehicles are not permitted in permanent carpeted areas without approval by the
Event Supervisor. Approval may be given when the required covering (plywood, polyethylene,
carpet) is used to protect the permanent carpeting in the area.
- The loading docks are hazardous areas. Contractor will ensure employee attention to safety,
trip and-fall hazards etc. Where possible equipment such as forklift attachments, carpet rolls,etc. should be stored in trailers and not on the dock.
RIGGING AND HANGING OF SIGNS
- Rigging defined: The term 'rigging' as used in this document refers to the overhead suspension
of objects from any portion of the physical building.
- Plans for installation of show banners and signs, directional signs, decorations and any rigging
must be submitted to the Event Supervisor for approval 30 days in advance of the show
dates. Contractors shall notify the Event Supervisor immediately if any rigging requests are
made which do not comply with stated rules and regulations.
- Signs, banners and decorations may not be affixed to the facility or suspended from any
surfaces without prior approval. All items that are freestanding may not obstruct exit doors, exit
lights, fire alarm pull boxes, fire hose cabinets, fire extinguishers or facility signage. Suspension
points do not include light fixtures, sprinkler heads, cable tray, conduit, HVAC ducts, etc.
- No signs or banners may be placed on the exterior of the facility.
- Rigging and hanging from the hang points is subject to approval by Spokane Convention
Center management and is expected to meet generally accepted industry standards.
- All rigging must comply with the Rigging Rules and Regulations of the Spokane Convention
Center.
1. Qualified and trained riggers must perform all rigging and hanging.
2. Rigging and hanging may only be performed by employees or subcontractors of the
General Service contractor who are familiar with the house hang points, load limits, rules
and regulations.
3. Each General Contractor will appoint a person who is responsible for all hanging and rigging
and must provide the name of the designated person to the Event Supervisor prior to
move in.
4. All custom rigging and hanging (i.e. slings) must have owner's identification attached.
5. All homemade trusses must be accompanied by engineering specifications in order to be
installed. Any trusses NOT manufactured by an industry-recognized truss company are
considered 'homemade.'
6. All rigging must be done with rated, stamped and approved hardware only.
7. All rigging points must be protected against damage.
8. All rigging and hanging is subject to inspection by the Spokane Convention Center for
compliance with rules and regulations.
- At the conclusion of the event, all hang points, devices, wires, clips, etc. used for hanging
and/or rigging must be removed and the house restored to normal conditions.
- The Spokane Convention Center will charge the rigging contractor for any costs associated
with damage done to the building or removal of rigging supplies.
EVENT DAYS
- Spokane Convention Center personnel are not allowed to enter an exhibit booth for the purpose
of cleaning.
- The decorating company is responsible for servicing all of the their equipment (i.e. booth carpet
cleaning, emptying booth trash cans, etc.).
- Removal of crates, cardboard and/or pallets from the exhibit hall is required.
- Storage is not allowed inside the building without prior approval by the Event Supervisor.
- Exit signs must be visible at all times.
- Exhibitors with displays having damp garbage or similar debris are required to place this refuse
in disposable plastic garbage bags. The decorator or the exhibitor should provide garbage
bags of sufficient strength. These bags should be placed directly into the dumpsters located in
the loading dock by the exhibitor or decorator.
Move Out
- The Spokane Convention Center expects the facility to be returned to the condition in which
it was received with the exception of normal wear and tear. Excessive clean up required by the
Spokane Convention Center will be invoiced to the licensee.
- All decorator generated garbage must be removed from the facility, including but not limited to
the exhibit hall, loading dock and service yard.
- Any item or supplies used to fasten material (tape, nails, screws, etc.) must be removed.
- Any debris left on premises, tape or residue left on any surface, will be removed by the Spokane
Convention Center and the cost will be invoiced to the licensee.
- The Spokane Convention Center trash receptacles are available to the decorating company for
disposing of tabletop debris prior to removing table covering.
- The decorating company is responsible for all damages resulting from their activities.
- Any property not removed by the end of the contract and that has not been claimed is considered
abandoned by the licensee, it's contractors or exhibits. The Spokane Convention Center may
take possession of and dispose of such property without liability. The licensee will be invoiced
the cost of such disposal.
- The decorating service contractor equipment may not remain in the building or service yard
past the contracted time, without prior approval by the Event Supervisor.
GENERAL SERVICE CONTRACTOR RATES
Spokane Convention Center equipment is available for rental at decorator rates. Contractor agrees not
to use or transport any equipment, supplies furnishing or other property belonging to the Center without the Event Supervisors written permission. Reservations to use Spokane Center Equipment can be made five working days in advance. Use by Spokane Convention Center staff takes precedent, but every attempt will be made to accommodate equipment use by General Contractors when possible.
When renting Convention Center equipment the contractor must retrieve the equipment from the designated storage area and return it after use.
| Forklift |
$60 - less than 4 hours |
$125 / day |
| Boomlift |
$50 per hour |
$300 per day |
| Genielift |
$35 per hour |
$200 per day |
| Pallet Disposal |
$25 / pallet |
|
| Waste Compactor Service |
$350 per service |
|
| Tables |
$10 per table |
Not to be used for exhibits |
| Chairs |
$1.50 per chair |
|
| On-Site Storage |
$0.15/sq ft/per day |
|
| Carpet Cleaning in Halls |
Dec Day Rate |
|
| Electrical Truck Hookup |
$100/day |
|